building industrial sheds in bowen

Contact Us

Enquire Now in bowen

Building Your Future

At Austeel Sheds, we bring forward-thinking design practices to the forefront, ensuring every project reflects our dedication to quality and integrity.


Whether you’re a tradie in need of a secure workshop or a business owner searching for additional storage space, we’ve got you covered. Our industrial sheds are crafted with precision and tailored to withstand the unique climate and conditions of Bowen.


Let’s build the foundation for your business’s future together. For more information, to start your project or to enquire about our other services (residential sheds, car ports, garages, rural sheds, patios and awnings), call us today on 0402 030 504.

Get a Quote

Frequently Asked Questions

  • What areas do you service in Bowen?

    We service the entire Bowen area, including Bootooloo, Delta and Queens Beach. Contact us to confirm if we serve your specific location.

  • Do I need a building permit to construct an industrial shed?

    Yes, constructing an industrial shed typically requires a building permit. The specific requirements vary by location, but generally, you will need to submit plans and obtain approval from the local council or relevant authorities to ensure the shed meets all building codes and safety standards.

  • What are the key design considerations for an industrial shed?

    When designing an industrial shed, key considerations include the intended use of the space, load-bearing requirements, accessibility for large vehicles and machinery and compliance with health and safety regulations. Additionally, consider the need for insulation, ventilation, natural lighting and electrical and plumbing systems based on the shed’s specific functions.

  • How long does it typically take to construct an industrial shed?

    The construction time for an industrial shed varies depending on the size, complexity and materials used. Smaller, prefabricated sheds can be erected in a few weeks, while larger, custom-designed structures may take several months to complete. Factors such as weather conditions, site preparation and obtaining necessary permits can also influence the overall timeline.

Learn More

Enquire Now bowen

Share by: